电缆材料变更申请书通用 电缆变更需要什么手续(5篇)

  • 上传日期:2023-01-17 05:03:01 |
  • ZTFB |
  • 12页

每个人都曾试图在平淡的学习、工作和生活中写一篇文章。写作是培养人的观察、联想、想象、思维和记忆的重要手段。范文怎么写才能发挥它最大的作用呢?以下是小编为大家收集的优秀范文,欢迎大家分享阅读。

推荐电缆材料变更申请书通用一

乙方(承包单位):party b (contractor )

鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;

鉴于乙方系具有施工资质的工程建设单位,愿意依照招标文件所规定的质量要求分包电缆沟施工项目并完成;

为了按期完成合同段工程,经双方协商,在遵守总合同的基础上,根据《中华人民共和国民法典》和建设工程法律法规中的有关规定,由乙方承包本工程工程项目。

为明确双方的权利、义务,特签订本合同,以共同遵守。

whereas party a have, with the owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;

whereas party b is the qualified constructor, be willing, in accordance with the quality requirement of bidding documents, to subcontract and complete the project;

this contract: for the purpose of accomplishment of the contracted engineering, parties hereto, through negotiation and on the basis of complying with the general contract, in accordance with law of contract and relevant regulations of laws and rules on construction engineering, agree to award this project to party b for completion.

in faith whereof, to specify parties hereof ‘s rights and liabilities, make and enter into this contract hereby for abidance by parties.

一、工程概况及承包内容 project overview and contracting works

1.1工程名称及概况:工程名称:电缆沟工程。 本工程涉及三个变电站,分别是现有的220/35kv a472变电站、现有的35/10kv b301s变电站以及新建的35/10kv c581变电站。工作内容为三个变电站之间和从三个变电站接至mv用户的电力电缆、控制电缆、接地电缆敷设所需电缆沟的开挖工程。

name of project and overview: name of cable trench;

the project involves three substations, namely the existing 220/35kv a472 substation, the existing 35/10kv b301s and a new 35/10kv c581 substation. work contents are the excavation works of trenches, between three substations and from the locations of three substations to mv user, which are necessary for laying out power cable, control cable, earth cable.

this is the power, control and grounding cable trench excavation project among three substations and for mv users connected to the three substations.

1.2 合同形式:本合同单价为综合单价,采取固定单价承包方式。固定单价承包单价为乙方在本合同约定工期内完工的结算依据,不作任何调整。

contracting form: unit price hereof is subject to the comprehensive unit price, contracted form is fixed unit price. fixed price of contracted project is the settlement basis of party b’s completion within the work period stipulated hereof, without any adjustment.

1.3 工程范围内全部电缆沟工程,包括:电缆沟施工:沟底整平夯实、垫层(砂砾、碎石垫层夯实),钢筋(包括电缆沟盖板钢筋、墙帽钢筋、电缆沟检查井盖板钢筋、墙身预埋钢筋、吊装预埋钢筋、镀锌钢筋等所有部位)的防锈、除锈、制作、绑扎、钢筋的损耗等;施工支架的安装与拆除、模板(钢模)的安装与拆除、预埋件的制作与安装、外露钢板的防腐处理、角钢支架(包含电缆竖架及电缆横架)的制作与安装,砼的浇筑及养生(包括基础、墙帽、沟盖板等),电缆沟开挖等与此工程范围有关的一切施工项目。

any and all works within the scope of cable trench engineering include that trench execution, ditch bottom leveling compaction, cushion (gravel, gravel cushion compaction), steel (including cable channel cover plate reinforced, coping reinforced, cable trench manhole cover plate reinforced, wall body embedded reinforcement, hoisting and pre buried steel, galvanized steel and all other parts),anti rust, rust removal, making, binding, loss of reinforced steel; installation and removal of formwork support (steel mould), embedded parts of the fabrication and installation;anti-corrosion treatment, angle bracket (contain cable vertical frame and cable cross) production and installation, pouring and curing of concrete (including the foundation, coping, trench cover etc.), cable trench wall masonry, bottom and the inside and outside surface, cable trench cover, trench excavation and other works associated with this project.

1.4 合同单价含所有直接费用、间接费用、利润及税金。包括为实施和完成本合同工程所需的人工费、材料费、机械设备费、试验检测费以及合同明示或暗示的所有责任、义务。

contract unit price is conclusive of all costs of direct or indirect expenses, interests and taxes in addition to the cost / payment, which are paid for completion and execution of the project herein, of labor, material, machinery / equipment, test / inspection and all responsibilities and liabilities being express or implied herein.

1.5 工程期限: 日开工,工期共计 天。

time limited of project: work will commence from the date of , and the total period of work is days.

二、工程标准及技术要求:project standard and technology requirement

2.1 招标文件中的合同通用条款、合同专用条款、技术规范,建设单位、监理和甲方要求以及书面或口头指示、工程师通知等。

the general and particular provisions, technical norms of the bidding documents in addition to the requirement, direction in written or oral, engineer’s notice, which given by constructor, supervisor and party a.

2.2 建设单位下发的技术规范、评定标准、检验标准、招标文件、设计图纸等。

the technical norms, evaluation standard, inspection standard, bidding documents and design drawings.

2.3 甲方与建设单位签订的工程施工合同及附件(以下简称总合同,包括设计图纸、往来文件等),乙方均遵守。

party b should comply with the construction contract and appendix hereof, which are concluded between party a and the owner, hereinafter referred to as general contract including design drawings and documents received or dispatched between party a and the owner.

三、工程数量确认及材料和设备供应 quantity confirmation and material / equipment surpply

3.1 结算工程数量确认:quantity confirmation for settlement

以乙方实际施工完成的工程量和经过甲方技术负责人、监理工程师现场验收,并以建设单位计量的设计图纸计算数量为依据进行计量结算工程量。

the work quantity for settlement will be measured subject to party b’s actual completion and the site acceptance of party a’s technician in charge and supervision engineer in addition to the quantity which is calculated on the design drawings of the owner.

3.2 为完成本合同工程所需的所有机械设备均由乙方自备,当乙方需使用甲方设备时,根据甲方现场负责人签字确认的使用时间及司机的运转记录,结算时按附表价格予以扣除。

all machinery / equipment which are necessary for completion of the engineering hereof will be dispatched by party b itself, in case of necessity of using party a’s equipment by party b, the expense thereof will be deducted from settlement sum on the price schedule, in accordance with the use time and driver operation record, which are confirmed by the signature of party a’s person in charge on site.

3.3 甲方供应给乙方的钢筋施工损耗已计入本合同相关单价之中,对超用的钢筋材料的费用,甲方在当月的工程结算款中直接扣除,其单价为:甲方采购价×(1+10%)。电缆沟施工所用砼、片石、砂砾、预埋件(钢板)等(除钢筋外全部材料)均由乙方购买,购买费用由乙方承担。

the loss of reinforcing bar for construction supplied by party a have been calculated into the corresponding unit price herein, the expense of over-use of steel will be directly deducted from the same month ‘s settlement sum by party a, the unit price thereof is party a’s purchase price×(1+10%). all materials excepting enforced steel, used for the execution of cable trench, including concrete, stone, gravel, embedded parts ( steel plate) will be purchased by party b and the cost thereof will be on the account of party b.

3.4 施工所需的其余材料(如制作钢筋所需的匝丝、焊条等)由乙方自行采购,费用由乙方承担,但该材料质量必须符合施工技术规范要求,须经监理工程师和甲方认可后方可使用。

乙方所使用的燃油、润滑油、电力及修理、保养等全部费用均由乙方自行承担。如需甲方提供油料,则按领用材料数量乘以甲方采购价的110%计算;机械修理及保养费用均按实际发生费用计算。

other materials required for execution such as coil wire and welding rod needed for manufacture of reinforcing bar will be purchased by party b and the cost thereof on party b, provided that the quality of the material should meet the requirement of construction technical norms and subject to supervision engineer and party a’s confirmation before using into execution. all cost and expense of fuel, lubricating oil, electricity and repair, maintenance and other expenses will be on party b’s account, in case of necessity of fuel provision by party a, the cost will be calculated on the used amount multiply 110% of party a’s purchase price; the cost of machinery repair / maintenance will be charged on actual expenses.

四、甲、乙双方权利、义务 rights and responsibilities of parties

4.1 甲方的权利、义务 rights and responsibilities of party a

4.1.1 负责提供施工图纸(包括变更图纸)和技术资料,并进行有关的安全、技术交底。

being responsible for the provision of execution drawing including the amended same thereof and issue the explanation and interpretation on the related safety and technology.

4.1.3 负责工程的施工放样及检查验收;负责现场技术质量管理,并负责协调施工。

being responsible for the construction setting out and inspection / acceptance of engineering in addition to the quality management of technical quality on site as well as for coordinating construction.

4.1.6 按约定支付工程款。making the payment of project cost to party b.

4.2 乙方的权利、义务 rights and responsibilities of party b

4.2.1 乙方投入到本工程的人员和设备等必须满足甲方和监理工程师、建设单位的要求。对甲方、监理、建设单位为保证质量、加快进度要求增加机械设备时,乙方接受并执行。

personnel and equipment which are dispatched to this project by party b should satisfy the requirement of party a , supervisor and owner. in case of necessity of increasing machinery and equipment for ensuring quality and acceleration of progress, at the request of party a, supervisor and owner, party c should follow and implement the same.

4.2.2 乙方对工程质量负责,必须严格遵守国家及相关部门质量标准,工程质量必须满足《电缆工程质量检验评定标准》,接受建设单位、监理工程师和甲方派驻的负责人的全过程监理。甲方有权对乙方质量不合格的工程不予支付。

party b should be responsible for project quality, be in strict accordance with the quality standards of state and relevant authorities, ensure the project quality meet standards of acceptance and assessment of cable engineering quality and accept the whole process supervision of owner, supervisor and the responsible person authorized by party a which is entitle to refuse to effect the payment for the unacceptable works done by party b.

五、工程质量检查、验收 inspection and acceptance of project quality

5.1 乙方严格按照施工设计图纸和施工规范组织施工,服从甲方质检人员和监理工程师的现场指示和检查,并提供有关的质量检验表、施工原始记录等资料。

party b should, strictly in accordance with design drawings and work specifications, organize the execution, accept the direction and inspection on site by party a’s quality inspector and supervisor and show the list of quality inspection, original records for execution and so on.

5.2 乙方每道施工工序完成后,填报质量报验单及施工原始记录,经甲方质检人员检查验收合格后,方可进行下道工序施工。

party b should, on completion of each process of work, fill in form of inspection application and original record of work and not conduct next process of work unless and until the inspection and acceptance thereof have been made by party a’s inspector.

六、工程验收与工程款的支付 acceptance and payment of project

6.1 甲方现场负责人核实乙方的本期完成工程量,对乙方已完工程进行验收,为乙方验收合格的工程开据《工程数量签认单》。每月25日前,乙方应提交手续完备的《工程数量签认单》开具结算单进行阶段结算。甲方每月扣留乙方工程款的10%作为保留金,作为质量保证金。

the responsible person on site of party a will verify party b’s completed quantity of the current stage and make acceptance of completed project, issue the confirmation of work quantity to party b’s qualified project. party b should, on or before 25th each month, submit the confirmation of work quantity of full formalities being companied by the settlement report for the milepost settlement. party a will deduct 10% party b’s project cost each month as retention money for the deposit of quality warranty.

6.2工程完工后,经工程师验收达到验收标准,并且竣工资料齐全,乙方应在验收合格之日起28天内报送最终结算资料。

party b will, within 28 days upon the completion of project and satisfy the acceptance standard by confirmation of engineer, with full data / documents, submit its materials for final settlement.

6.3 工程款支付方式 payment

6.3.1 本合同履行完毕后,双方及时办理结算,最终结算单在经过甲方各部门及项目领导审批会签后,项目经理审批签字并加盖项目经理部公章后方能生效。

parties hereto will, upon the performance of this contract, effect the settlement in time, however, the effectiveness of final settlement should be subject to the review and countersignature of party a’s concerned departments, project ‘ leader in charge, review / signature of project manager with official seal of project department.

6.3.2 甲方每期工程款支付按照当期结算款的80%,乙方工程完工后,在扣除按照合同条款应该扣除或者暂扣项目后的余额进行无息支付。

80% of settlement payment of the current stage by party a, in each and every stage payment , will be effected to party b and the balance amount, after deduction of the amount due to be deducted or withhold sum, will be paid without interest.

七、违约责任 breach liabilities

7.1 合同签订后,如乙方在规定期限内没有按合同要求组织机械设备和人员进场,甲方和乙方签订的合同将自动解除。甲方有权安排其他队伍施工,乙方承担伍万元的违约责任,并承担因此给甲方造成的损失。

provided that party b fail to, within the time limited after signature of this contract, in accordance with the requirements hereof, dispatch machinery / equipment and personnel enter into the site, this contract will be determined and discharged automatically. party a in entitle to employ other constructor for execution of this project, for which party b should bear the breach with liquidated damages of fifty thousands us dollar and compensate party a’s loss arising therefrom.

7.2 如果乙方的工程质量、工程进度达不到甲方要求、限期内不能改进时,甲方有权收回或分割乙方所承担工程,直至终止合同,乙方应承担由此给甲方造成的损失,并承担相应的违约责任,违约金按照给甲方造成损失的30%收取,并在结算中一次性扣除。

provided that if party b’s quality and progress of project fail to satisfy party a’s requirement and no improvement within the limited time, party a is entitle to take away or cut apart of the project which under party b’s construction until terminate this contract, for which party b should bear the liability of compensating to party a’s loss. the liquidation damages will be effected on the basis of 30 % of party a’s loss amount, which will be deducted in lump sum from final settlement

八、工程量和设计的变更 alterations of quantity and design

8.1 因设计变更而增加或减少的工程内容,如果在已标价工程量清单中有适用于增加的工程内容的单价,则采用该单价;如果无适用于增加工程内容的单价,则由乙方提出建议价格经甲方书面确认后执行。

in the respect of the added or deducted works due to design alteration, where the unit price in the priced bill of quantity is suitable to the added or deducted works, such unit price may be applied; where no suitable unit price to be applied, the recommended price suggested by party b will be executed after party a ‘s written confirmation thereof.

8. 2 乙方在施工中提出的合理化建议及对设计图纸或施工组织设计的更改或换用,应经甲方及监理、建设单位的批准方可实施。

any reasonable suggestion or alteration of design drawings, construction organization design, which submitted by party b during construction, can not be implemented unless and until have been with the approval of party a, supervisor and owner.

九、争议解决方式 settlement of dispute

本合同履行过程中发生的或与本合同有关的一切争议,双方协商解决,若协商不成,应提请仲裁委员会按照该会规则进行仲裁,仲裁结果是最终的。

all disputes arising out of or related to this contract during performance of contract should be resolved through consultation of parties hereto, if fail to settlement by negotiation, should be submitted to arbitration committee for arbitration in accordance with its rules and arbitration award is final and binding upon parities hereto.

十、不可抗力 force majuere

不可抗力事件发生涉及乙方施工场地的,乙方应立即通知甲方,在力所能及的条件下,迅速采取措施,尽力减少损失。因合同一方延迟履行合同后发生不可抗力的,不能免除延迟履行方的相应责任。

in case of occurrence of force majuere on party b’s construction site, party b should forthwith give notice thereof to party a and to the extent which is practicable to take measures for trying to decrease loss. provided that force majuere occur after delay of performance by one party to this contract, no corresponding liability of the delaying party may be discharged or excused.

十一、其他约定事项 miscellaneous

11.1 本合同未尽事宜,依照有关法律、行政法规执行,双方也可以达成书面补充协议。本合同的附件和补充合同均为本合同不可分割的组成部分,与本合同具有同等的法律效力。

any outstanding issues hereof will be conducted in accordance with the relative laws and administration regulations and / or supplementary agreement in writing may be concluded by parties hereto. the appendix and supplementary contract herewith are integral parts of this contract, which have equal valid and authentic.

11.2 本合同一式四份,甲方三份,乙方一份。本合同自双方签字或盖章且乙方在合同中承诺的机械设备和人员在规定期限内进场后生效;工程竣工验收合格、价款结清后自行终止。

this contract will be made in four copies, party a will hold three copies and party b will hold one copy. this contract will come into force on and after parties’ signatures and sealing hereon and the machinery / equipment which are undertaken by party b in contract and personnel enter into the site.

11.3. 附件:电缆沟工程施工技术要求

the appendix herewith is technical requirement of cable trench excavation.

甲方(盖章):party a ( sealing ) 乙方(盖章):party b ( sealing )

法定代表人 legal representative 法定代表人legal representative

本合同附件: appendix herewith:

推荐电缆材料变更申请书通用二

购货方:(以下简称甲方)

供货方:(以下简称乙方)

为了甲乙双方在平等、自愿、互赢互利的基础上达成一致协议,特订立本合同,以共同遵守。

第一条电缆的名称、品种、规格、价格和数量(50米/捆)

总价:元(人民币大写:整)

第二条质量要求:乙方所提供产品须严格执行国家标准:gb9330-88。

第三条电缆的供货期限与货款的结算方式

1.电缆的供货期限:供货期限总共为5个月,按照甲方的要求分5次供货,每月一次,每个月的供货量以甲方实际要求为准。

2.货款的结算方式:货款、运杂费和其它费用,以现金或银行承兑汇票结算,货款每月结算一次,6个月内将全部货款付清。

第四条对电缆提出异议的时间和办法

1.甲方在验收中,如果发现电缆的品种、规格、质量不符合规定,应一面妥为保管,一面在10天内向乙方提出书面异议;超过10天内未通知乙方的,视为合乎规定。

2.乙方在接到需方书面异议后,应在10天内负责处理,否则,即视为默认甲方提出的异议和处理意见

第五条乙方的违约责任

1.乙方不能交货的,应向甲方偿付不能交货部分货款的10%的违约金。

2.乙方所交产品不符合规定的,如果甲方同意利用,应当按质论价;如果甲方不能销售的,应根据具体情况,由乙方负责包换或包修,并承担调换或退货而支付的实际费用。

第六条甲方的违约责任

1.甲方中途退货,应向乙方偿付退货部分货款4%的违约金。

2.甲方逾期付款的,应按中国人民银行有关延期付款的规定向乙方偿付逾期付款的违约金。

3.甲方违反合同规定拒绝接货的,应当承担由此造成的损失和运输部门的罚款。

第七条不可抗力

甲乙双方的任何一方由于不可抗力的原因不能履行合同时,应及时向对方通报不能履行或不能完全履行的理由,以减轻可能给对方造成的损失,在取得有关机构证明以后,允许延期履行、部分履行或者不履行合同,并根据情况可部分或全部免予承担违约责任。

第八条本合同如发生纠纷,当事人双方应当及时协商解决,也可以直接向人民法院起诉。

第九条,本合同一经签订,立即生效。

购货单位(甲方):(公章)供货单位(乙方):(公章)

法定代表人:_______法定代表人:_____

推荐电缆材料变更申请书通用三

需方: 签订地点:

签订时间: 年 月 日

依照《中华人民共和国合同法》及有关法律法规,遵守平等、自愿、公平和诚实信用的原则,双方就 的电线电缆购销事项协商一致,订立本合同。

第一条 合同概况

1、工程名称:

电缆盘由供方及时回收,若有丢失需方概不负责。

第六条 随机的必备品、配件、工具数量及供应办法:无。

第七条 合理损耗标准及计算方法:无。

第八条 交(提)货方式、地点及时间:按需方的要求按时运至工地现场,并且将货物卸至需方指定的地点。交货时间为合同签订后 天(如有变化,以需方指定材料员的书面通知为准)。

第九条 运输方式及到达站(港)和费用负担:汽车运输,运输过程中所有费用由供方承担。

第十条 检验标准、验收方法

1、供方产品进场时必须由需方签字确认后,方可作为结算的依据。

2、按电线电缆现行的国家标准、行业标准及供方提供的经需方确认的样品验收。外观质量可当场检验,内在质量,需送有资质检测机构检测,以检测结果为验收依据。

第十一条 成套设备的安装与调试:无。

第十二条 付款方式

1、合同签订后, 天内需方支付合同金额的 %(即人民币: 元)作为定金;货物运至工地现场,经验收合格后20天内付清所有货物价款。

2、供方供应的货物按需方指定的地点进场并对外观质量验收合格后付至合同价款的85﹪,供方在收到货款后5天内开具等额合法的税务发票给需方,否则需方有权拒绝支付任何款项,且供方承担违约责任并按未开发票货款的10%支付违约金。

3、供方供应的货物须经当地有资质的检测机构检测合格后20天内付清所有货物价款。

第十三条 本合同解除的条件:供方的供货质量、时间未符合合同约定,需方有权解除合同,并追究供方的违约责任。 第十四条 违约责任

1、供方未按合同约定供货,需方因此发生的损失由供方承担;超过5天不能交货的,需方有权解除合同。

2、需方未按合同约定付款,供方有权停止供货。

第十五条 合同争议的解决方式:本合同在履行过程中发生争议,由双方当事人协商解决,若双方无法协商一致,可向合同签订地人民法院提起诉讼。

1、电缆进场后按国家相关标准进行检测,检测费用由供方承担。并免费负责指导电缆安装、敷设、试验等技术服务工作。

2、供货数量为暂定量,具体量以需方在施工过程中的要求为准,最终按实结算。

3、供方提供的电缆是全新的。电缆的封端应严密,不允许有接头。多芯电缆要求分色,其分色符合国家标准。

4、供方必须遵守需方质量/环境/职业健康安全管理体系的相关规定,供方人员进入施工现场必须遵守需方现场的各种规章制度,因供方原因或产品质量问题造成的事故由供方自行承担,并承担由此给需方造成的一切损失。

供方: 需 方: 单位:单位名称:(章) 卡号:开户行:浦发银行 日 期:

推荐电缆材料变更申请书通用四

合同编号:

出卖人:电缆有限公司

签订地点:*开发区工地现场

买受人:**有限公司签订时间: 年 9 月 24 日

第一条标的、数量、规格及技术要求:详见附件。合同总价为92.504 万元,人民币金额(大写):

壹佰玖拾贰万伍仟零壹拾肆元整。如供货过程中数量型号发生变更,货物的单价按让利后总价同比例下福

第二条质量标准:所供电缆必须符合国家标准,线径及长度均不得有负公差,需提供产品出厂合格

证和3c 认证。

第三条出卖人对质量负责的条件及期限:质保期为安装完成验收合格后8 个月。

第四条包装标准、包装物的供应与回收:包装必须确保货物运抵现场的完好无损。电缆盘由出卖

人及时回收,若有丢失买受人概不负责。

第五条随机的必备品、配件、工具数量及供应办法:无。

第六条合理损耗标准及计算方法:无。

第七条标的物所有权自买受人验收合格后时起转移, 但买受人未履行支付价款义务的,标的物

属于出卖人所有。

第八条交(提)货方式、地点:按买受人的要求分批运至工地现常交货时间为合同签订后0 天。

第九条运输方式及到达站(港)和费用负担:汽车运输,费用由出卖人承担。

第十条检验标准、方法、地点及期限:按电缆国家标准、现行行业标准及出卖人提供的经买受人

确认的样品验收。

第十一条成套设备的安装与调试:无。

第十二条结算方式、时间及地点:合同签订后,货物运至现场,经验收合格后付至货物价款的60%;

安装完成、调试合格、验证文件齐全后付至货物价款的90% ;其余0%作为质量保证金,在质保期满后

4 天内付清(不计利息)。

第十三条担保方式(也可另立担保合同): 无。

第十四条本合同解除的条件:出卖人的供货质量、时间未按合同约定,买受人有权解除合同。

第十五条违约责任:出卖人未按合同约定供货,买受人在权对出卖人进行合同总价%~5% 的罚款。

买受人未按合同付款,出卖人有权停止供货。

第十六条合同争议的解决方式:本合同在履行过程中发生的争议,由双方当事人协调解决;也可由

当地工商行政管理部门调解;协调或调解不成的,按下列第(一)种方式解决:

(一)提交南京仲裁委员会仲裁;

(二)依法向人民法院起诉。

第十七条本合同自双方签订之日起生效。

第十八条其他约定事项:

推荐电缆材料变更申请书通用五

根据公司安排,本人于20xx年3月15日至20xx年5月20日供电所高压班,主要针对10千伏线路与变压器的维护、检修。在这两个月期间我参与过电力抢险、户表归箱、变台上移、户表检查等工作。公司还在节假日给我们提供各种展现自己特长的平台。

一供电所实习回顾

1做好春检春视,迎峰度夏工作

春检春视主要针对10千伏线路、配电屏、表箱、电缆t接点的检查及复合式绝缘氧化锌避雷器的更换,公司领导为保障变压器在雷雨天气可靠的运行,力争减少配电变压器少出故障,不出故障原则,实行一年一换。这方面超前于国电。我认为一个无论从事任何职业都应尽心尽责,尽自己最大努力,才能求得不断的进步,经过自己多学多问及师傅的耐心讲解,我对变压器低压套管在什么情况下会发生闪络及原因,线路发生电晕的现象等有了深入的了解。迎峰度夏主要针对用电量增大,变压器产生过负荷及相间短路情况进行预测、分析、处理解决。公司领导为加强这些方面管理制定“谁主管,谁负责”“一岗双责”进行管理,对员工工作进行“一天工作当日完,问题责究现买单”制度管理。督促员工为迎峰度夏做好充分的准备工作。譬如变压器低压侧负荷的测试,实行“一日三测”争取能从测试中发现问题判断有无过载情况及三相负荷平衡

二、安全生产保持了较稳定的局面。

公司“明责任、严纪律、强监督、重奖罚的要求,把安全检查生产放在一切工作的首位,加强安全工作的领导,建立建全全方位,全过程的安全责任网络,全面落实安全责任层层签订控制事故责任书,建立了以所长为第一责任人的安全管理体系,积极参加公司组织各项安全活动,在安全教育上重视调查研究到施工现场了解实情,解决实际问题,注重工程建设期间的安全管理,狠抓了职工的安全教育,实行一月一考制度,签定了安全责任书,加大施工现场的纠章检查,发现问题及时纠正,保证了全所各项工作的顺利进展,由于管理严格,措施得力,确保了全过程的安全生产,杜绝了各类事故的发生,设备检修和树障处理到位,减少了配电事故率,配电设备完好率上升,按时召开安全线损分析会,针对实际工作抓重点,查隐患,查事故苗关和不安全因素彻底清除安全死角,严肃处理违章违纪。

三供电营业窗口建设,认真落实服务承诺和规范化管理

阆中电力总公司成立完善了管理制度,狠抓职工的职业道德教育,面对新的电力市经营情况,及时转变观念,以政策法规为准则,以优质服务为宗旨,加大以市经营观念和责任意识教育,调动职工认真为客户服好务,提高服务质量,多购多供电的积极性,规范工作程序,对客户实行承诺服务,客户中心坚持全天24小时值班,保宁供电所坚持16小时有人值班,对行动不方便的客户坚持上门服务,上门收费。如:杨海刚、赵键只要接到报修电话就立即上门检修,一般事故立即修,特殊事故说明情况作好解释工作不过夜。对于行动不方便的用户,主动上门去收费,一个月跑上三四趟,诚信服务尽最大努力减少欠费停电,受到用户好评。在实际工作中同志们更是积极主动,今年的城网改造工作,全所同志工作到人责任到人,谁分管的线路、台区,谁负责整改,放弃休息时间,不分星期假期每天工作都在十多个小时以上,同时,还要兼顾夜间值班,几乎每天都是在吃不上晚饭的情况下到所里坚持值班,在今年的夏季用电高峰中,没有发生一次因我们的责任造成大面积停电的情况。同时坚持了所长带班制度,人员不够时,不该值班的同志也到所里帮忙而毫无怨言,四月的一天,城南018线路突然断电,经查是水上娱乐城50kva变压器过负荷烧坏造成,为了让客户尽快用上电,胡所长亲自主持安排,另调了一台变压器,高压班几个师傅冒着30多度的高温,不怕油污、不顾劳累了一天,挑灯夜战、经过三个多小时,再22点前,重新更换了一台变压器,恢复了该院的正常用电,用他们辛勤的汗水和热情的服务,换来了客户满意。总之,不论是白天、夜晚、刮风、下雨,只要接到事故电话,同志们都能以最快的速度去帮助客户排忧解难,经过员工的共同努力,保证了夏季高峰的安全度过。

抄、核、收是我们营销工作的重点,直接牵涉到我们的经济效益,在工作中,我们实事求是,每月按时抄表,不估抄,不漏抄,抄后及时审核纠错,把该收的收回来,不多收,不少收,按照城关所制定的考核办法,按月计算,全奖全罚,并进一步,明确责任,重申纪律,充分调动每个员工做好抄、核、收工作的积极性和自觉性。狠抓电费回收工作,根据局电费回收工作精神,把电费回收工作责任落实到位,做到有电送的出,电费就要按时结零,坚持谁管理谁负责的原则。特别是负责管理三元街、公安局等几个单位的师傅,每月都要跑上数趟,一趟找不到人就早上去堵,晚上到家里去要,真是费尽千辛万苦,想尽千方百计,经过全所职工的不懈努力,保证了每月电费的按时回收结零,并回收陈欠电费2万余元。

四降损增效

保宁供电所是目前阆中所有供电所线损最大的一个,就这个问题胡所长就在这个问题上召开线

损分析会,线损分析会上,对逐条线路的线损进行认真研究分析,及时掌握全所的线损情况。在召开线损分析会时,每人事先要拿出自己所管辖线路的月度线损分析报告,在会上一一发言,让大家品头论足,各抒己见,共同探讨。对于线损高的要认真查找原因,对症下药,提出下一步解决的办法;对于线路运行良好,线损稳中有降的线路,要善于总结经验加以推广,以达到相互学习相互促进之目的。分析会结束后,每人要写出月度线损分析报告进行存档,在下一次线损分析会上进行对照检查,看其措施是否落实,线损是否降了下来,是否收到了预期效果,并且对会上发现的问题必须马上整改,城南018线路的线损突然正常的8%突增到13%,经过分析会上分析,排除设备原因后,大家一致认为可能有人偷电,会后,迅速组织全所人员连夜对该台区进行排查,当即发现有人偷电,事实面前该用户补足了电量,次月该台区的线损重新回归8%,这就是线损分析会的好处。

当然线损的高低,在管理模式适合的情况下,最终还是要有先进的设备。首先,根据负荷实测情况,调整各所的变压器容量配备,或进行线损技术改造,满足不同地区的负荷需求,减少大马拉小车所造成的损耗。其次,要淘汰、更换高耗能变压器,积极推行节能型s11系列变压器,降低配变损。严格按规程定期校验及轮换电能表和互感器,尤其要注意对大用户的计量表计加强管理。利用农网改造机会,全面采用新型电子式电能表,不但计量更准确,更降低了电表的本身损耗,有效地缓解了取消表损对线损的冲击,优化供电方式,要对用电负荷大的低压用户宣传并合理配备低压补偿电容,减少无功电流,提高供电线路的负荷承载能力,确保理论线损降到最低点。

计量装置是线损管理的核心部位,电能表就好像在商品买卖交换过程中的秤,应该保证准确无误。对于供电所来讲,如果计量表失去准确性,或者是窃电者蓄意在计量表上做手脚,都会给企业带来巨大损失,也就会导致线损的升高。所以,在计量上要采取统一集权的管理办法。首先,要把好计量表的校验关,计量表要由具有校验资质的部门校验,其他任何单位和个人校验的表记应该不给予采用。其次,对每个配电台区的计量箱钥匙要由专人管理,管理者对企业要绝对的忠诚,不得有丝毫的贪心和私欲。农村低压客户也应如此,要由对工作高度负责的农村电工来统一管理钥匙,任何私人不得干预。否则如果计量箱的钥匙分散管理,一旦遇到个别私欲膨胀者,他们就可能乘隙而入,采取不正当手段来窃取电能,造成电量流失、线损升高。再次就是要定期做好计量装置的轮换工作,按照周期轮换确保计量准确。

五实行安全挂帅

第一条坚持“安全第一”方针

认真贯彻执行国家有关安全生产的各项政策和法规,坚持“安全第一、预防为主“的方针,严格执行《农村低压电力技术规程》、《农村低压电气安全工作规程》、《农村安全用电规程》、《农电事故调查统计规程》和有关电力安全、技术法规。

第二条供电所安全管理主要职责

1.根据一组织安全培训及安全考核工作。

2.负责辖区内高、低压线路、输配电设备及用电设施的安全运行、巡视检查、维护检修、安装验收。按规程要求保证设备完好率和安全可靠性。

3.负责组织辖区内安全用电知识的宣传和普及工作。

4.认真宣传和贯彻执行《电力法》、《电力设施保护条例》等有关规定,依法保护电力设施。

第三条基础工作管理

县供电企业要制定详细的供电设施更新和改造计划,确保设备健康水平。各供电所要建立健全设备健康状况、缺陷处理、事故检修、安全试验、安全检查、安全考核等各种台账、档案资料。

第四条巡视检查管理

必须建立电力设施定期和不定期的巡视检查制度。制定巡视检查工作计划,责任要落实到人,巡视检查内容应符合《农村安全用电规程》的具体要求。巡视检查中发现的设备缺陷,必须认真做好纪录,对严重缺陷要及时处理,一般缺陷要列入检修计划,及时修复。

第五条漏电保护器管理

农村用电户按《农村低压电力技术规程》的要求,装设漏电保护器。供电所负责配电台区内公用总保护和分支保护漏电保护器的安装、运行、维护管理,定期或不定期地进行检查和测试,并建立运行记录和测试纪录。

第六条检修试验管理

建立设备检修和试验制度。按规程要求的试验周期,编制设备检修、试验及设备升级改造计划,并认真组织实施。做好设备管理工作,提高电力设备和用电设施的安全健康水平。供电所的安全生产器具和检修设备及仪器仪表,要按规程要求定期试验。

第七条安全责任制

供电所要建立安全责任制,并纳入县供电公司的安全管理体系。所长为第一安全责任人,与县供电企业第一安全责任人签订安全生产责任状,对本所安全生产负全面责任。要设一名专职或兼职安全员,负责本所安全管理工作计划的具体实施,指导农电工做好安全用电管理工作,农电工要与供电所长签订安全考核内容,并与其工资奖励挂钩。

第八条安全例会制

供电所定期召开安全生产例会。研究安全工作,组织职工、农电工进行规程学习。并组织考试,不合格者不得上岗。

第九条安全合同管理供电所在与客户签订供用电合同时,要明确安全责任。安全责任划分以资产产权分界点为界。资产归谁所有,发生事故由谁负责。乡办或村办企业和个体企业电力设备若委托供电所代管,产权虽不属供电所,但发生责任事故后应由代管方负主要责任。

第十条安全检查建立安全用电监察制度,定期进行安全检查,检查安全隐患、防范措施,做好安全事故的预防工作。

第十一条”两票、三制”管理供电所对线路、设备的运行、维护管理必须严格执行“两票”、“三制”。“两票”合格率达到100%。各供电所工作票签发人、工作许可人、工作负责人由县供电企业组织统一考核,合格后确定,并发文分布。

第十二条安全考核管理供电所要建立安全生产考核制度。每年进行安全工作总结评比,对安全工作做出贡献的人员给予表彰奖励;对违反安全规程、制度,造成事故或扩大事故、隐瞒事故者应视其情况严肃处理;对玩忽职守,造成重大事故责任者,依法追究法律责任。

六实习总结

经过两个月在阆中电力公司的实习,阆电是一个规章制度严谨,奖罚分明,目标远大能成就人梦想的公司,公司推行的51312人才选拔,提高员工的工作积极性,在这里只要通过自己的不懈努力奋斗,想要就能得到。在这里自己吧在大学三年里所学的理论知识与实践相结合,而且还使自己的交际能力、表达能力、实践能力得到了提高。